images ns 11 pile driving operations management

If a pile moves in excess of some predetermined criterion, the pile is redriven to redevelop the required penetration and capacity. Approximately piles were driven beneath the alignment of the tunnel structure. Settlement data obtained during second phase of pile driving. Additional instrumentation was installed, including piezometers, MPHG, and an inclinometer. Despite the use of partial preaugering, a significant portion of the piles showed excessive heave and required substantial redrive efforts. Schematics of the three types of hammers are shown in figures 9 through On April 21,after approximately 2 weeks of pile driving on the west side of the site, initial heave displacements of 0.

  • Construction Site Management

  • Chapter 3 Temporary Non-Stormwater Management. NS PILE DRIVING OPERATIONS. Refer to: ITD Standards and Specifications for Highway Construction. Pile Driving Operations.

    Construction Site Management

    NS Categories. EC. Erosion Control. SE.

    Sediment NS. Non-Stormwater. Management Control. ☑. WM. Waste Management and. Pile Driving Operations. NS January California Stormwater BMP NS. Non-Stormwater.

    Management Control. ☑. WM. Waste Management and.
    Once a pile has been installed, the hammer may be used to drive the pile again at a later time. They were generally installed in a grid-like pattern, with a spacing of approximately 1. This particular record is for the installation of a m-long, cm-diameter PPC pile installed at the airport as part of contract C07D2. The piles were driven using a Delmag D single-acting diesel hammer. The tunnel structure is approximately m in length and is located where ramp 1A-A splits from the arrivals road.

    images ns 11 pile driving operations management
    Ns 11 pile driving operations management
    Figure 9.

    Controlling potential sources of water pollution and managing waste and non-storm water systems or watercourses is the entire purpose of the CSM class.

    At a depth of As a result of the excessive heave greater than 2. These data suggest that the lateral deformations are of the same magnitude and behavior as the vertical deformations.

    Video: Ns 11 pile driving operations management Link Belt Diesel Powered Pile Driver Hammer Working

    An initial heave displacement of 0.

    Pile Driving Operations. NS BMP Objectives il Stabilization ediment Control racking Control nd Erosion Control on-Storm Water Management. Materials and. Pile Driving Operations NS Photo 1. Preventive Measures and Troubleshooting Guide. Field Condition: Common solutions are: Used oil, filters, and fluids. NON-STORM WATER MANAGEMENT BMPS BMP CHECK IF CHECK IF No.

    Maintenance X NS || Pile Driving Operations X Pile driving operations not.
    Driving was stopped after a final blow count of 39 blows per 2.

    images ns 11 pile driving operations management

    Data from the multipoint heave gauge showed that the magnitude of the heave was relatively constant within the upper 30 m, as shown in figure Once the pile is in position, pile driving is initiated and the number of hammer blows per 0. Construction Site Management Training Disk: This disk contains the Powerpoint presentation that WE used to train you so that you can reference it and showcase it to employees whenever you need to! From a cost perspective, pile heave is important because redriving piles can require significant additional time and effort.

    Net heave values of 3. Figure

    images ns 11 pile driving operations management
    Ns 11 pile driving operations management
    The piles, consisting of cm-diameter PPC piles, were designed to support a concrete mat foundation in addition to a viaduct located above the tunnel.

    The inclinometer data that were obtained adjacent to the building are shown in figure Typical pile driving record. In order to ensure compliance with these rules, the California Department of Transportation Caltrans has inserted this new Standard Special Provisions SSP into most new construction contracts. Pile driving for the east approach was executed in two phases. Additional instrumentation was also installed following the start of the second phase of work, including a multipoint heave gauge MPHG to measure vertical movement with depth and an inclinometer to measure lateral movement.

    U.S.

    Department of Transportation/Federal Highway Administration Construction issues associated with pile driving during this project are also presented.

    A single-acting hydraulic hammer (figure 11) uses a hydraulic actuator and pump to. Slab. – Approach No. 5. Slab. – –​ C19B1. NS-SN. POO-ENV-Best Management Practices-Non Stormwater Erosion NS Paving and Grinding Operations.

    Pile Driving Operations. Page Construction Site Management (CSM) is a new Standard Special Provision and Maintenance NS Pile Driving Operations NS Concrete Curing NS​.
    The tunnel was constructed using the cut-and-cover method, and thus a portion of the overburden soil was excavated prior to pile driving.

    Video: Ns 11 pile driving operations management Marine Pile Driving - Marine Construction

    The second phase began on July 13,and concluded on August 17, These BMPs provide guidance on handling and storage of materials. Figure A hydraulic hammer with an kN ram and a 1. The first phase began on April 5,and concluded on June 10, An advantage of hydraulic hammers is that the free-fall height, and thus the energy delivered to the pile, can be controlled more accurately.

    images ns 11 pile driving operations management
    2D PLAN 5 MARLA HOUSE
    The bounce chamber temporarily stores and redirects energy to the top of the ram, allowing the stroke height to be reduced and the blow rate to be increased.

    In order to ensure compliance with these rules, the California Department of Transportation Caltrans has inserted this new Standard Special Provisions SSP into most new construction contracts. Toward the end of driving, blows are recorded for every 2.

    Soil heave was recognized early on as a potential problem and following phase I driving in contract C07D1, several mitigation efforts were initiated. Despite the use of partial preaugering, a significant portion of the piles showed excessive heave and required substantial redrive efforts. Figure 9.

    images ns 11 pile driving operations management